Electrical Connections

Written by Vulcan. Posted in The Dam Project

The switching station may be connected to a power line using the LT or HT connection models (Low Tension or High Tension voltage). These are objects, placed so the support frames are in the switching yard. They have a set of power poles or transmission towers as part of the model.

These match two of Auran’s built in power line splines, and they will connect to these. For best connection, keep the initial placement of the splines aligned with the LT or HT assets.

Dam LT Transmission Connector  kuid2:60238:27133: 
Dam HT Transmission Connector   kuid2:60238:27132:1
Powerline   kuid:-1:100613
Powerline B  kuid:-1:100587