Structural Assets

The Power Station (Substation) building can be used make a Hydroelectric power plant.

The pipeline is a spline that can be run from the dam to the building or elsewhere.

At the back of the dam there is usually an intake tower, this is a spline, height adjustable.

Available Assets

kuidbutton3


 

Dam Substation kuid:60238:27120
Dam Pipeline kuid2:60238:38204:1
Dam Intake Tower kuid:60238:38206